Lagoon System

The property owner or the licensed installer shall submit a completed Wastewater Stabilization Pond Application (pdf) and fee (pdf). The Wastewater Stabilization Pond Permit will not be issued until the lagoon construction is approved, the fence is constructed according to the fencing requirements (pdf), a lock is placed on the gate, and the berms are seeded with grass.